Reliance Power starts boiler for sixth unit at Sasan UMPP

Written By Unknown on Jumat, 02 Januari 2015 | 21.03

Reliance Power Friday said the boiler for its sixth and last unit at the 3,960 MW Sasan Ultra Mega Power Project in Madhya Pradesh has started functioning.

Reliance Power  Friday said the boiler for its sixth and last unit at the 3,960 MW Sasan Ultra Mega Power Project in Madhya Pradesh has started functioning.

The company said in a statement that 3,300 MW (five 660 MW units) of the project are already operational.

Coal production has already commenced from the 20 million tonnes Moher and Moher-Amlohri coal mines associated with the power project.

Reliance Power has 3,205 MW power generation capacity, including 3,120 MW thermal and 85 MW renewable energy sources.

The RPower scrip closed at Rs 63.20, up 1.28 percent, on the BSE.

Reliance Power stock price

On January 02, 2015, Reliance Power closed at Rs 63.20, up Rs 0.80, or 1.28 percent. The 52-week high of the share was Rs 113.20 and the 52-week low was Rs 58.40.


The company's trailing 12-month (TTM) EPS was at Rs 0.04 per share as per the quarter ended September 2014. The stock's price-to-earnings (P/E) ratio was 1580. The latest book value of the company is Rs 60.02 per share. At current value, the price-to-book value of the company is 1.05.


Anda sedang membaca artikel tentang

Reliance Power starts boiler for sixth unit at Sasan UMPP

Dengan url

http://kebugaranhidup.blogspot.com/2015/01/reliance-power-starts-boiler-for-sixth.html

Anda boleh menyebar luaskannya atau mengcopy paste-nya

Reliance Power starts boiler for sixth unit at Sasan UMPP

namun jangan lupa untuk meletakkan link

Reliance Power starts boiler for sixth unit at Sasan UMPP

sebagai sumbernya

0 komentar:

Posting Komentar

techieblogger.com Techie Blogger Techie Blogger